Change management: why transformations stall, and it is almost never the technology

A transformation rarely stalls on the tool. It stalls on adoption. The method: sponsor, line managers as relays, communication, milestones and measuring real use.

Illustration of a team crossing a gold bridge towards a new geared machine, with a leading figure holding out a hand to those who hesitate
Contents
  1. What change management covers
  2. ”70% of transformations fail”: a figure to handle with care
  3. Why transformations stall: technology is rarely to blame
  4. The sponsor: carrying the change, not just signing it off
  5. Line managers as relays: the link that decides adoption
  6. Communicating: the why, repetition and listening
  7. Set milestones and measure adoption, not just go-live
  8. Self-test: is your transformation at risk of stalling?
  9. From go-live to adoption

The new ERP works, the data has been migrated, and the vendor has closed the project. Yet six months later, orders still go through a shared Excel file and every branch has kept its old habits. The technology was delivered, but the change never happened.

In brief

Change management covers the actions that take an organisation from one way of working to another, all the way to real use by the people concerned. When a transformation stalls, the tool is rarely to blame: the sponsor disappears after the launch, managers do not know what to tell their teams, communication boils down to a single announcement, and the project is judged on go-live rather than on adoption. The method rests on five levers: the sponsor, line managers as relays, communication, milestones and measuring adoption.

What change management covers

A transformation changes a tool, a process or an organisation. Change management deals with what happens next for the people involved: understanding why things are changing, giving up a way of working they have mastered, learning the new one, then adopting it with no going back.

In French, you will hear conduite du changement, gestion du changement and accompagnement du changement (leading, managing and supporting change). The three expressions are mostly used interchangeably, and all of them correspond to change management. One caution: in IT departments, change management also refers to controlling the changes made to systems.

The American author and consultant William Bridges popularised a useful distinction. Change is an external event: a switchover date, a new organisation chart, new software. Transition is the inner process each person goes through: the ending of the old way of doing things, a neutral zone in between, then a new beginning. A change can be planned to the day, whereas a transition does not move at the same pace for everyone. That is why a project can be a technical success and still unfinished on the human side.

”70% of transformations fail”: a figure to handle with care

You have probably read that 70% of change projects fail. The most quoted version of the claim comes from an article by Michael Beer and Nitin Nohria, published in the Harvard Business Review in 2000: “The brutal fact is that about 70% of all change initiatives fail.”

The figure does not stand up to scrutiny. In 2011, Mark Hughes, a researcher at the University of Brighton, examined the five published sources most often invoked to support it, and concluded that there is no valid and reliable empirical evidence to back up this failure rate. And what does failing mean, anyway: missing the deadline, going over budget or falling short of the expected benefits? As long as the definition varies, an overall rate tells you nothing about your own project.

What is better documented is the gap between projects that receive change management support and the rest. Prosci, a firm specialising in change management, surveyed more than 2,600 practitioners: 88% of those whose change management programme was rated excellent met or exceeded their objectives, against 13% when it was rated poor. These are self-reported data, collected by a company that sells these methods: a correlation, not proof. Even so, the order of magnitude speaks for itself.

Why transformations stall: technology is rarely to blame

In 2020, Boston Consulting Group combined a survey of 825 executives with its work at 70 companies to understand what sets successful digital transformations apart. It identifies six decisive factors: an integrated strategy with clear goals, commitment from leaders from the CEO through to middle management, high-calibre talent, agile governance that drives adoption, effective monitoring of progress, and a modular technology and data platform led by the business. Only one of the six is about technology.

The same holds for artificial intelligence. According to BCG, 10% of the value of an AI transformation comes from the application itself, 20% from data and technology, and 70% from redesigning ways of working, culture, governance and collaboration between humans and AI.

Digital transformation in Morocco is no exception. The public effort is real: according to the Chef du gouvernement (Morocco’s Head of Government), speaking in June 2026 about the Digital Morocco 2030 strategy, public investment in digital rose from 11 million dirhams in 2021 to more than 1.7 billion dirhams in 2024 (in French). Inside companies, an ERP, a CRM or the digitisation of a process only delivers its value if teams, at head office and in the branches alike, change the way they work.

The symptoms of a transformation that is getting bogged down look much the same from one company to the next:

Observed symptomLikely human causeLever to pull
The steering committee empties after the launchThe sponsor has delegated the subject and no longer shows upThe sponsor
Teams find out about the change from an internal memoFrontline managers were not preparedLine managers as relays
Rumours travel faster than official messagesCommunication is top-down and one-offCommunication
The project seems never-ending, and fatigue sets inNo visible progress for monthsMilestones
The tool is live, but a parallel file survivesThe project was judged on go-live, not on useMeasuring adoption

The sponsor: carrying the change, not just signing it off

The sponsor is the executive with authority over the people whose work is going to change, not necessarily the one who pays for the tool. In a group subsidiary, it is the local managing director, even when the decision comes from head office. In a family business, it is often the founder.

The role carries a lot of weight. In Prosci’s studies, active and visible executive sponsorship has ranked as the top success factor for more than 25 years, and projects that have it are six times more likely to meet or exceed their objectives. The word that matters is “visible”: a sponsor who signs the project brief and then disappears sends a message that everyone understands.

Nor can the sponsor carry the project alone. John Kotter, who watched more than a hundred companies try to transform themselves, makes building a coalition, a group of committed people who guide the change, the second of the eight steps of his method. In practice, this starts with the other members of the leadership team: if the sales director hints that the new CRM “will blow over like the others”, the sponsor has already lost some ground.

MomentWhat the sponsor does
Before the launchExplain in person why things are changing. Secure explicit commitment from peers.
During the roll-outSettle conflicts between priorities quickly. Ask about usage in project reviews, not just about the schedule.
After go-liveUse the new tool personally, recognise the teams that are making progress, refuse quiet returns to the old process.

A simple test: if your employees name the project manager or the vendor as the person driving the project, the sponsor has not yet stepped into the role.

The sponsor sets the course, and frontline managers decide, often without realising it, whether their teams will follow. Their attitude shows straight away: a manager who sighs while presenting the new process has already done their communication.

Prosci describes five roles for managers during change, grouped under the acronym CLARC: communicator (they explain to their team what changes for them), liaison (they pass feedback from the ground back to the project), advocate (they visibly support the change), resistance manager (they look for the real cause behind any reluctance) and coach (they give each person the training and support they need). The same article reports that 63% of respondents feel their organisation does not adequately prepare managers to lead change. For managers to take on these roles, give them four things:

  1. A head start. A manager who hears the announcement at the same time as their team can neither reassure people nor answer their questions.
  2. A short kit. The why in three sentences, what changes and what stays the same for the team, the timetable, and who to pass unanswered questions to.
  3. A channel for feedback. A regular check-in with the project team, where their feedback gets an answer.
  4. Time. If their usual objectives stay unchanged during the roll-out, the hours needed to support their teams will simply not exist.

In a multi-site organisation, this link is decisive: for a branch in Fez or Tangier, the local manager is often the only voice of the project. These roles can be learned, for example in TakeUp’s training programmes for managers and project managers, which work on leadership stance.

Communicating: the why, repetition and listening

A message is not understood just because it has been sent. The gap between what is said and what is taken in also shows up with strategic priorities, as our article on the difference between agreeing and being aligned explains. Three rules make the difference:

  • The why before the what. Start from the problem the change solves, in concrete terms: less re-keying of data, customer deadlines met, visibility over stock. The tool comes after.
  • What stays the same. The customers, the team and the business know-how remain: saying so reassures people as much as announcing what is moving.
  • Two voices, several channels. The sponsor explains the company’s reasons, and the manager explains what it changes for the team. A message needs to go out several times, in several forms, and in the language people use on the ground: an announcement written in French at head office sometimes works better when a workshop supervisor repeats it out loud, in Arabic or Darija.

Plan the reverse route too: where questions go, who answers them and how quickly. Here is the backbone of a communication plan:

MomentWho speaksMain message
One month beforeThe sponsorWhy things are changing, what stays the same, the timetable
Two weeks beforeEach managerWhat changes for the team, who will be trained and when
Switchover dayThe project team and the managersWhere to find help, how to report a problem
Two weeks afterEach managerWhat is not working, what has been fixed
Two months afterThe sponsorThe first adoption results, the adjustments decided

Set milestones and measure adoption, not just go-live

Without visible results along the way, fatigue sets in and the sceptics start to speak up. Kotter devotes the sixth step of his method to short-term wins, with a phrase that sums up the idea: “Wins are the molecules of results.” Break the roll-out into short milestones, each with a result that everyone can see: a pilot site that has fully switched to the new tool, a monthly report that used to take two days and now comes out in an hour. Announce these wins, name the teams that achieved them, and fix problems on the pilot before you extend.

Then measure what counts. A project judged on go-live declares itself a success at the precise moment the real work begins. What you need to track is adoption:

IndicatorWhat it measuresExample of a measure
UsageAre people using the new tool?Weekly active users, transactions going through the new process
ProficiencyDo they use it without help?Trend in support requests, data entry errors
WorkaroundsIs the old process still alive?Parallel files, approvals by email outside the tool
SentimentHow is the change being experienced?A three-question survey, every month
Expected benefitIs the change delivering on its promises?Processing time, error rate, time taken to close the month

Set a target and a date for each indicator before the launch, review them every month in the steering committee, and only close the project once the adoption targets are met. A parallel file is rarely an act of rebellion: more often than not, it reflects a need that the new tool does not cover. Go and find out which one.

Self-test: is your transformation at risk of stalling?

Tick the statements that are true for your current project.

  • The sponsor still attends project reviews, not just the launch.
  • The other members of the leadership team defend the project in front of their teams.
  • Managers were informed before their teams and have a kit to talk about it.
  • Their objectives were lightened during the roll-out.
  • Every employee concerned can explain in one sentence why things are changing.
  • Questions from the ground get an answer within a week.
  • A visible win has been achieved and announced in the last three months.
  • The steering committee tracks actual usage, not just the schedule and the budget.

Six boxes or more: your transformation is well supported, so keep up the pace until you reach the adoption targets. Between three and five: the project rests on too few people, so start with the weakest lever. Fewer than three: the risk of getting bogged down is real, so go back over the people side of your scoping before extending the roll-out. If the leader is carrying execution alone, co-leadership can give them a partner.

From go-live to adoption

Before your next steering committee, ask a single question: how many people have actually been working differently since the launch? If nobody can answer, change management has not started yet, even if the tool works perfectly. TakeUp Consulting, in Rabat and Casablanca, supports project steering and change management, from scoping to the final review, as well as digital transformation projects. To take stock of a project that is stalling or just getting started, tell us about your context.

Frequently asked questions

Your questions on the topic

What are the main change management techniques?

The most useful ones are simple: an active and visible executive sponsor, line managers prepared to relay the change to their teams, a communication plan that explains the why and makes room for listening, short milestones that make progress visible, and adoption indicators tracked after go-live. Training and one-to-one support complete the set-up for those who have to learn new ways of doing their work.

What is Kotter's 8-step change model?

John Kotter, professor emeritus at Harvard Business School, proposes eight steps: create a sense of urgency, build a coalition that guides the change, form a strategic vision, enlist volunteers on a broad scale, remove barriers, generate short-term wins, sustain acceleration, then embed the new behaviours. The model comes from his book Leading Change, and its author has developed it further since.

What are the 3 stages of change management?

The most widely cited breakdown is attributed to the psychologist Kurt Lewin: unfreeze (challenge the current situation and prepare people's minds), change (roll out the new practices), then refreeze (stabilise and embed these practices). William Bridges offers another breakdown, centred on what people go through: the ending of the old way of doing things, a neutral zone in between, then a new beginning.

What is the difference between conduite du changement and gestion du changement?

In everyday use, both French expressions refer to the same approach, which English simply calls change management: preparing, supporting and embedding a transformation with the people concerned. 'Conduite' (leading) stresses steering by the leadership, 'accompagnement' (supporting) the support given to teams. Beware one false friend: in IT departments, change management also refers to the process that controls changes made to systems.

Is it true that 70% of transformations fail?

The figure is widely repeated, but it has not been proven. In 2011, the researcher Mark Hughes examined the five published sources most often cited in support of this rate and found no valid and reliable empirical evidence to back it up. You are better off defining what success would mean for your own project, then measuring adoption throughout the roll-out.

Get started

Do your teams need
fresh momentum?

Cohesion, alignment, change management: we design tailored workshops and support programmes for your teams in Rabat, Casablanca and internationally. Let's talk about your context.

Let's talk about your project Your details stay confidential and are only used to get back to you.
The TakeUp Consulting team

"Our strength is the combination of two areas of expertise: projects and people."

TakeUp Consulting, Rabat & Casablanca